The diagrams illustrate the changes that have taken place in a school between 1985 and the present. Overall, the school has undergone significant changes, the most important of which are the addition and development of facilities to cater to the educational and physical activities of an increased number of students.
On the one hand, In 1985, the north of the school campus featured a rectangular car park with a road surrounding it, connecting an entrance and an exit. This car park has since been changed to a semicircular shape along with the road, while another small car park in the southwest has been removed. Additionally, the driveway leading southward from the road to the large playing fields has also been demolished, making space for trees.
On the other hand, In 1985, the south side of the school premises was primarily occupied by playing fields. These fields have since been halved to make way for the construction of a new physical complex, which includes a pool and a fitness center to the west of the playing fields. Additionally, a library located to the west of the campus has been upgraded to a learning resource center, which now includes a new computer room. To the south of this center, an expanded building of classrooms has been constructed, which was previously located to the east of the former library.
