Our system will evaluate the answer based on this AI-generated description.
The image shows current and planned future development maps with a river, farmland to the north, a town to the west, and housing zones illustrated; the existing map details three factories adjacent to the river and two south of a circular road structure, with a split road network extending east; the future development plan replaces all factories with housing, adds a north-south main road with a bridge over the river, incorporates three shops to the southwest near the roundabout, an additional east-west road integrating with two playgrounds and more housing areas replacing surface water bodies and spaces used earlier for factories, aligning longitudinally along both sides of the straightened paths.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The 2 maps illustrate the differences between todays and future establishment of Norbiton Industrial Area.
Firstly, most of the factory building will be rebuild become housing complex and the rest of them will be demolished. There will be 7 of housing complex one in the north of the river, 3 each located in the west and the east of the circle road.
Additionally, the road will be added. From the circle road in the centre of the city, there will be another road to the north and a three-junction; moreover, there will be another little circle road below the bigger one
Furthermore, there will be more public places developed in this area. In the southwest of the big circle road, shops are planned to build. On the other hand, in the southeast corner of this road, there will be a medical centre. In addition, among 2 housing complex in the east, there will be a big playground and in the corner of the road a school will be build
Word Count: 169