Our system will evaluate the answer based on this AI-generated description.
The image illustrates the design of a modern landfill for household waste divided into three stages: Construction involves a man-made hole with natural rock, synthetic lining, drainage pipes, drainage tank, and clay; Use demonstrates household waste deposited into the landfill, leading to waste liquid; Closure shows the sealed landfill with clay cover and a pipe for gas extraction.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The process illustrates various stages involving the production of a modern landfill for domestic waste.
Overall, the diagram consists of 3 phases which are construction, use, and closure. The most striking feature is that there are diverse products which are produced from household waste.
In the first phase, the hole is dug under a natural rock layer. Subsequently, a clay layer and a synthetic layer are added into the hole then drainage pipes are put on the synthetic floor.
In the next step, household waste liquid is transported by trucks and poured into the hole.
Following that, gasses from liquid waste go through a pipe, while clay is added on the surface of the hole.
Word Count: 115