The process introduces the modern landfill for household design.
In general, the process consists of three main stages, starting from the construction and ending with the final step of the closure.
The beginning of the process is marked by digging a hole in the earth, above the nature rock surface. The next step is that the man-made landfill will be lined with the substance layer on the clay surface to stop the impurity percolates from the ground. Following this step, the drainage tank and drainage pipes will be installed. The next term of the process is the household waste flushes into the hole. Then, the waste liquids will be held in the drainage tank and the extracted gases will transport through the pipes. Finally, the landfill will be covered with another thick clay on top of the waste.
