The map illustrates the changes made to a city park before and after renovation.
Overall, the park has been modernized with new recreational facilities such as a swimming pool, a café, and barbecue areas while maintaining accessibility through an improved pathway system.
In detail, the original park was divided into two sections. The left side was a green space filled with trees, while the right side featured a boating lake surrounded by a flowerbed, a café, and additional trees. The entire park was enclosed by a continuous cycle path and footpath, allowing visitors to move around easily.
Following the renovation, several key modifications have been implemented. On the left side, three benches have been added, providing seating areas, while a café has been constructed in the top-right corner. Additionally, three barbecue spots have been introduced, enhancing leisure opportunities. On the right side, the boating lake has been replaced with a centrally located swimming pool. In the southern part of this section, some trees have been removed to make space for a tennis court, though one tree remains in the bottom-left corner. Furthermore, a new cycle path and footpath have been built between the park and Park Avenue, improving accessibility.
