The maps show the Westwood hospital’s overall changes from 2010 to 2020.
The hospital were reconstructured both internally and externally, with major alterations, such as new special centres and additional parking lots for staff.
The north building which previously contained only three parts, now is divided into five. The speciality clinic, which previously was locatted in the east side of the building, was moved in th centre, right below the emergency centre on the map. The intense caring unit (ICU) was shrinked to fit the alterations. Currently, the east side is divided in two by pharmacy and covid centre.
The big changes were made in the south buiding. Previously cancer module was turned into child care. The surgery was enlargened and takes area of the waiting rooms. The latter one was integrated with reception, but it required for cafeteria to be removed. Moreover, outside the greenzone was turned into car parking specifically for hospital staff.
