The maps illustrate the layout changes of a theater between 2010 and 2012.
Overall, the theater underwent significant modifications to enhance accessibility and functionality, with the addition of new facilities such as a restaurant and showers, while retaining key areas like the auditorium.
In 2010, the theater had a basic layout. A stage occupied the central area, flanked by storage to the west and media space to the north. The auditorium, positioned near the main entrance, was the largest section. A ticket office was situated in the southwest corner, with an admin office adjacent to it. A café was located opposite these offices.
By 2012, the theater had been redesigned extensively. While the auditorium remained unchanged, the stage was expanded. The media space replaced the former storage area in the west, and the storage was relocated to the east. New showers were added beneath the media section. Notably, the admin office and ticket office were demolished to make way for a restaurant, with the former relocated above the restaurant and the latter moved to the southeast corner.
