The diagram shows the stages involved in the production of the design of an up-to-date landfill for household waste. Overall, the handle waste process has three main stages, spanning from construction and ending with closure.
Initially, the process of construction begins with digging a big man-made hole until it hits a natural rock bottom. Following this, the man-made hold was filled by a layout clay. After which, a small drainage tank was added to the hole’s bottom after it was dug and it was coated on the surface with a synthetic lining layer. Finally, drainage pipes were provided to be arranged on top of the layers.
The process continues with proceeding to use, the household waste was poured into the hole and then the water liquid will be transmitted to the available position, which is drainage pipes. The procedure concluded with closure, gases pipes are inserted into the cavity before the hole was filled with clay.
