The maps manifest the installation of tourist facilities on a particular island. Overall, the island underwent a massive construction making it fully commercial by adding accommodations and restaurants as well as accessible by the presence of footpaths and vehicle tracks. The beach and trees remained unaltered, and the far-right side did not witness any development.
The former map had an extensively open space having a beach to its left side and trees to the opposite, that remained unchanged in both maps. But after the construction, the swimming area was supplemented along with the beach. In addition, accommodation and restaurant amenities had been erected along with the reception area, which were interconnected through footpaths and vehicle tracks.
Another remarkable alteration incorporated the development of a pier to the south of the island, which was squarely connected to the vehicle path heading towards the reception area. Ships and boats were there to enjoy rides onto the sea. All of the above progress occurred on the left and central parts of the island.
