The Cambridge IELTS Academic series uses authentic past papers from the official exam creators, making it the most reliable way to practice. Because the material closely matches the real Academic exam in format, logic, and difficulty, it is the best category to start with if you want a true exam experience.
Band 7The provided maps illustrate the southwest airport at present and outline the number of changes that are expected to take place in the future.
Overall, the airport will witness a considerable number of changes, including the number of gates, introduction of a sky train, shops, and addition of few more amenities for the passengers. Moreover, the area dedicated to security, passport control, and customs will remain intact.
To begin with, the airport currently has eight gates on the northern end and inside there is a walkway. By contrast, in future the number of gates will be increased to 18 and the walkway will be replaced by a sky train. There will be no changes expected in areas such as passport control, customs, and security.
At present, in the departure section, there is only a cafe and a check-in, while the arrival section is completely empty. However, in the departure area, as planned the cafe and the check-in will be relocated and a bag drop will be made. On the other hand, an ATM, a car hire, and a cafe will be established in the arrival area. Additionally, the number of doors in the departure and arrival sections will be increased.
The plan below illustrates redevelopments that will occur in the next year at an airport, showing its current state and its state after development. The redevelopments include various new features inside the building, before and after control stages.
Current features contain fundamental requirements for an airport, such as a check-in sector, cafe, walkway, and gates 1 to 8. The cafe and the check-in sector are located between the security passport control and the departure door. And finally, the walkway ensures fast access to the gates for people who arrive at and leave the airport.
The after-development plan contains enriched features for individuals. Firstly, before the security passport control sector, several changes have been planned, such as relocating the check-in sector and the cafe to different locations, adding an additional door, and planning a new sector to send luggage inside for departures. Once people pass the control and before reaching the gate, they will be able to visit different shops in the place located between these two places. The gate sector will not just be expanded, but also the old walkway will be replaced with a sky train to ensure faster transport. There will also be new changes for those who arrive at the airport; once they pass the passport control customs sector, access will be possible to a cafe, ATM, and a place to hire a car if needed.
In conclusion, several features will be added to give a better experience for both departures and arrivals, such as the ATM, if money is needed after arrival, and a rental to compensate for a drive. (Band 8.0)
The pictures illustrate the layout of the Southwest airport now, as well as the plan for its reconstruction.
Overall, the redevelopment of the airport will significantly expand gate capacity and add more commercial and transport facilities throughout the airport.
At present, Southwest airport has only eight gates which are located within walking distance. Meanwhile, the departure area consists only of a check-in area and a cafe, and there is space for a passenger security check and a passport control. In addition, the arrivals zone is completely empty at the moment.
In the future, the general gate area is expected to be expanded, causing ten more gates to be constructed. This expansion requires the construction of a sky train to provide easier access to the gates. Furthermore, some rearrangements will be made in the departures area, and a bag drop will be built. Free space between the gates and security check area will be filled with several shops. Moreover, the arrivals zone will provide a car hire service, an ATM, and a cafe.
The map compares the current layout of Southwest Airport with that of next year following the implementation of redevelopment plan. Overall, the site will evolve substantially from a simple layout into a more advanced and multifunctional area with the introduction of new gates, shops and a sky train.
The redevelopment plan primarily consists of the expansion of gates, introduction of several new facilities, in particular a sky train and a car hire service. To begin with, currently there are eight gates, which will be expanded dramatically, reaching 18 next year. In the northern section, walkways will be replaced by sky trains as a part of redevelopment plan. In contrast, security passport control and passport control customs area will remain unchanged in the same location. In the north-western area, new shops will be placed next year.
Turning to south-eastern area, an ATM, a cafe and car hire facilities will be installed, and the area will be expanded slightly towards the south. In the opposite corner, the existing cafe and check-in will be relocated to the eastern corner and southern site, respectively. The latter’s previous location will now be serving as bag drop. In addition, the number of departures and arrivals will be doubled, in both the south-eastern and south-western parts of the airport.
The plans illustrate the current layout of Southwest Airport and how it will appear after redevelopment next year.
Overall, the airport will experience significant expansion. The number of gates will increase, and several new facilities such as shops, a sky train, an ATM, and car hire services will be added, making the airport more modern and convenient for passengers.
At present, the airport has a simple structure with eight gates, which are connected by a walkway. The terminal building is divided into two main sections. On the left side, there is a security check and passport control area leading to departures, along with a café. On the right side, passport control and customs are located for arriving passengers. There are no additional passenger services apart from check-in and a café.
After redevelopment, the airport will be considerably larger. The number of gates will double from 8 to 16, arranged in a Y-shaped layout. A sky train will be constructed to connect the terminal with the gate areas. In addition, shops will be built near the security area. New facilities such as a bag drop, ATM, and car hire service will also be introduced, particularly in the arrivals section. Overall, these changes will improve passenger movement and services at the airport.
Band 9
The plans below illustrate the redevelopment plans for an airport site for the upcoming year.
Overall, it is clear that the airport will undergo numerous changes, starting with the refurbishment of the boarding gates, which will sharply increase, going from the 8 existing ones to a total of 18. These will be connected by a sky train that will enable faster arrival and will also ensure a better experience for disabled people. The departure and arrival doors will also be doubled; this will avoid queues, especially during the holidays, when the airport gets really crowded.
In addition, the airport terminal will also add some services, such as an ATM, a car rental, and a bag drop zone, which will be really useful for foreigners who need to change money or rent a car for their stay. Moreover, the terminal is going to include some shops to make the wait more enjoyable for travellers.
Taken as a whole, the figures show that the airport will be much more helpful and practical for tourists and citizens, who will not only have all the necessary places to organize their trip but will also have some places to disconnect in case of a delay. BAND 8
The given diagram demonstrates the area of an airport now and how it will look after the renovation.
Primarily, it is significant to note that currently there are only two entries to the airport: one for departures and the other for arrivals. These will be converted to four entries. The Departure area now has only check-in and a cafe, but it is observed that the check-in area that is present on the left side will be replaced by a Bag drop and will be reconstructed on the right side. The cafe that is present on the right side will be rebuilt in the west-south corner of the area.
Additionally, in the arrivals area there is nothing present, but in the future, another cafeteria will be constructed, and an ATM machine will be placed on the left side of it. The car hire area will be on the southeast side of the arrivals site.
Moreover, the Walkway area present on the back side will be converted to a sky train area.
To summarize, the airport area in the future will be extended, and more facilities will be provided to the public.
The sketches show the region of an airport presently and how it will look next year after renovation.
Overall, it is significant that the number of gates will be more than double and the walk way will be moved from the side to the middle of all gates.
To begin with, the departure and arrival which have an entrance presently will be expanded to two each. Also, the check in which is on the left side of the entrance will be replaced with a building where all travel bags will be dropped and a Cafè will be constructed below it. At the arrivals, another cafeteria will be situated at the far end with the automated teller machine gallery beside it.
Furthermore, the security post, passport control office and customs clearance arena will remain the same after refurbishment while marts will be built on the road that leads to the gates. Finally, the gates which were initially eight in number and built in a block shape will become Y shape and ten more gates will be included.
The maps compare the plan of an airport today and the plan with the improvements that will be introduced next year.
Overall, it is noticeable that the airport will be significantly extended in terms of gates. In addition, several basic amenities will be added.
In detail, the zone dedicated to arrivals will be enlarged, and inside it new amenities will be added such as an ATM, a cafe, and ultimately, a car hire service. The same pattern will be observed in the departures part. While currently there are only a check-in zone and a cafe, next year will be implemented.
By comparison, the zone dedicated to security controls will remain unchanged. However, after a person overcomes these controls, will be able to visit a new store that will be constructed next year. The most considerable change will be observed in the gates area. Ten gates will be added and with them a sky train for moving between each gate.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.
Plans & Pricing
Our mission is to make quality education accessible for everyone. However, to keep our hardworking team running and this service alive, we genuinely need your support! By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.
For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less
What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:
Chọn gói:
419,000₫277,000 ₫ cho gói 1 tháng(chỉ 9,233₫/ngày)
1,239,000₫597,000 ₫ cho gói 3 tháng(chỉ 6,633₫/ngày)
2,469,000₫1,027,000 ₫ cho gói 6 tháng(chỉ 5,706₫/ngày)
4,929,000₫1,417,000 ₫ cho gói 12 tháng(chỉ 3,936₫/ngày)
Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
beyenmedim hec.
Band 7The provided maps illustrate the southwest airport at present and outline the number of changes that are expected to take place in the future.
Overall, the airport will witness a considerable number of changes, including the number of gates, introduction of a sky train, shops, and addition of few more amenities for the passengers. Moreover, the area dedicated to security, passport control, and customs will remain intact.
To begin with, the airport currently has eight gates on the northern end and inside there is a walkway. By contrast, in future the number of gates will be increased to 18 and the walkway will be replaced by a sky train. There will be no changes expected in areas such as passport control, customs, and security.
At present, in the departure section, there is only a cafe and a check-in, while the arrival section is completely empty. However, in the departure area, as planned the cafe and the check-in will be relocated and a bag drop will be made. On the other hand, an ATM, a car hire, and a cafe will be established in the arrival area. Additionally, the number of doors in the departure and arrival sections will be increased.
The plan below illustrates redevelopments that will occur in the next year at an airport, showing its current state and its state after development. The redevelopments include various new features inside the building, before and after control stages.
Current features contain fundamental requirements for an airport, such as a check-in sector, cafe, walkway, and gates 1 to 8. The cafe and the check-in sector are located between the security passport control and the departure door. And finally, the walkway ensures fast access to the gates for people who arrive at and leave the airport.
The after-development plan contains enriched features for individuals. Firstly, before the security passport control sector, several changes have been planned, such as relocating the check-in sector and the cafe to different locations, adding an additional door, and planning a new sector to send luggage inside for departures. Once people pass the control and before reaching the gate, they will be able to visit different shops in the place located between these two places. The gate sector will not just be expanded, but also the old walkway will be replaced with a sky train to ensure faster transport. There will also be new changes for those who arrive at the airport; once they pass the passport control customs sector, access will be possible to a cafe, ATM, and a place to hire a car if needed.
In conclusion, several features will be added to give a better experience for both departures and arrivals, such as the ATM, if money is needed after arrival, and a rental to compensate for a drive. (Band 8.0)
The pictures illustrate the layout of the Southwest airport now, as well as the plan for its reconstruction.
Overall, the redevelopment of the airport will significantly expand gate capacity and add more commercial and transport facilities throughout the airport.
At present, Southwest airport has only eight gates which are located within walking distance. Meanwhile, the departure area consists only of a check-in area and a cafe, and there is space for a passenger security check and a passport control. In addition, the arrivals zone is completely empty at the moment.
In the future, the general gate area is expected to be expanded, causing ten more gates to be constructed. This expansion requires the construction of a sky train to provide easier access to the gates. Furthermore, some rearrangements will be made in the departures area, and a bag drop will be built. Free space between the gates and security check area will be filled with several shops. Moreover, the arrivals zone will provide a car hire service, an ATM, and a cafe.
The map compares the current layout of Southwest Airport with that of next year following the implementation of redevelopment plan. Overall, the site will evolve substantially from a simple layout into a more advanced and multifunctional area with the introduction of new gates, shops and a sky train.
The redevelopment plan primarily consists of the expansion of gates, introduction of several new facilities, in particular a sky train and a car hire service. To begin with, currently there are eight gates, which will be expanded dramatically, reaching 18 next year. In the northern section, walkways will be replaced by sky trains as a part of redevelopment plan. In contrast, security passport control and passport control customs area will remain unchanged in the same location. In the north-western area, new shops will be placed next year.
Turning to south-eastern area, an ATM, a cafe and car hire facilities will be installed, and the area will be expanded slightly towards the south. In the opposite corner, the existing cafe and check-in will be relocated to the eastern corner and southern site, respectively. The latter’s previous location will now be serving as bag drop. In addition, the number of departures and arrivals will be doubled, in both the south-eastern and south-western parts of the airport.
The plans illustrate the current layout of Southwest Airport and how it will appear after redevelopment next year.
Overall, the airport will experience significant expansion. The number of gates will increase, and several new facilities such as shops, a sky train, an ATM, and car hire services will be added, making the airport more modern and convenient for passengers.
At present, the airport has a simple structure with eight gates, which are connected by a walkway. The terminal building is divided into two main sections. On the left side, there is a security check and passport control area leading to departures, along with a café. On the right side, passport control and customs are located for arriving passengers. There are no additional passenger services apart from check-in and a café.
After redevelopment, the airport will be considerably larger. The number of gates will double from 8 to 16, arranged in a Y-shaped layout. A sky train will be constructed to connect the terminal with the gate areas. In addition, shops will be built near the security area. New facilities such as a bag drop, ATM, and car hire service will also be introduced, particularly in the arrivals section. Overall, these changes will improve passenger movement and services at the airport.
Band 9
can you share your contact detail, i want to contact you
The plans below illustrate the redevelopment plans for an airport site for the upcoming year.
Overall, it is clear that the airport will undergo numerous changes, starting with the refurbishment of the boarding gates, which will sharply increase, going from the 8 existing ones to a total of 18. These will be connected by a sky train that will enable faster arrival and will also ensure a better experience for disabled people. The departure and arrival doors will also be doubled; this will avoid queues, especially during the holidays, when the airport gets really crowded.
In addition, the airport terminal will also add some services, such as an ATM, a car rental, and a bag drop zone, which will be really useful for foreigners who need to change money or rent a car for their stay. Moreover, the terminal is going to include some shops to make the wait more enjoyable for travellers.
Taken as a whole, the figures show that the airport will be much more helpful and practical for tourists and citizens, who will not only have all the necessary places to organize their trip but will also have some places to disconnect in case of a delay. BAND 8
The given diagram demonstrates the area of an airport now and how it will look after the renovation.
Primarily, it is significant to note that currently there are only two entries to the airport: one for departures and the other for arrivals. These will be converted to four entries. The Departure area now has only check-in and a cafe, but it is observed that the check-in area that is present on the left side will be replaced by a Bag drop and will be reconstructed on the right side. The cafe that is present on the right side will be rebuilt in the west-south corner of the area.
Additionally, in the arrivals area there is nothing present, but in the future, another cafeteria will be constructed, and an ATM machine will be placed on the left side of it. The car hire area will be on the southeast side of the arrivals site.
Moreover, the Walkway area present on the back side will be converted to a sky train area.
To summarize, the airport area in the future will be extended, and more facilities will be provided to the public.
The sketches show the region of an airport presently and how it will look next year after renovation.
Overall, it is significant that the number of gates will be more than double and the walk way will be moved from the side to the middle of all gates.
To begin with, the departure and arrival which have an entrance presently will be expanded to two each. Also, the check in which is on the left side of the entrance will be replaced with a building where all travel bags will be dropped and a Cafè will be constructed below it. At the arrivals, another cafeteria will be situated at the far end with the automated teller machine gallery beside it.
Furthermore, the security post, passport control office and customs clearance arena will remain the same after refurbishment while marts will be built on the road that leads to the gates. Finally, the gates which were initially eight in number and built in a block shape will become Y shape and ten more gates will be included.
The maps compare the plan of an airport today and the plan with the improvements that will be introduced next year.
Overall, it is noticeable that the airport will be significantly extended in terms of gates. In addition, several basic amenities will be added.
In detail, the zone dedicated to arrivals will be enlarged, and inside it new amenities will be added such as an ATM, a cafe, and ultimately, a car hire service. The same pattern will be observed in the departures part. While currently there are only a check-in zone and a cafe, next year will be implemented.
By comparison, the zone dedicated to security controls will remain unchanged. However, after a person overcomes these controls, will be able to visit a new store that will be constructed next year. The most considerable change will be observed in the gates area. Ten gates will be added and with them a sky train for moving between each gate.