24 Hours Only: Get 39% OFF on Our Premium Plan - Check Out Now!
Part 1
You should spend about 20 minutes on this task. Write at least 150 words.

The plans below show the site of an airport now and how it will look after redevelopment next year.

Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

Samples

Words: 0

Overall Band Score

0.0
(+/- 0.5)
Vocabulary Complexity: N/A
Grammar Mistakes: N/A
Vocabulary Repetition: N/A

Task Response

0.0

Coherence & Cohesion

0.0

Lexical Resource

0.0

Grammatical Range & Accuracy

0.0
Our system evaluates your report based on this AI-generated description.
The image...
Given the complexity of the image, the above description may not be entirely accurate.
Word Count: 0
Word Count: 0
Word Count: 0

Improved Naturalness Comparison

Word Count: 0
Word Count: 0

Enhanced Essay Comparison

Word Count: 0
Word Count: 0
Part 1
Tip: Press F11 (Windows) or Ctrl+Cmd+F (Mac) to cycle between normal, focus, and fullscreen modes.

Cambridge IELTS 16 Academic Writing Test 3 (Task 1)

Leave a Reply

Your email address will not be published. Required fields are marked *

17 comments on “Cambridge IELTS 16 Academic Writing Test 3 (Task 1)”

  1. Kristina says:

    The pictures illustrate the layout of the Southwest airport now, as well as the plan for its reconstruction.

    Overall, the redevelopment of the airport will significantly expand gate capacity and add more commercial and transport facilities throughout the airport.

    At present, Southwest airport has only eight gates which are located within walking distance. Meanwhile, the departure area consists only of a check-in area and a cafe, and there is space for a passenger security check and a passport control. In addition, the arrivals zone is completely empty at the moment.

    In the future, the general gate area is expected to be expanded, causing ten more gates to be constructed. This expansion requires the construction of a sky train to provide easier access to the gates. Furthermore, some rearrangements will be made in the departures area, and a bag drop will be built. Free space between the gates and security check area will be filled with several shops. Moreover, the arrivals zone will provide a car hire service, an ATM, and a cafe.

  2. Telman Asgarov says:

    The map compares the current layout of Southwest Airport with that of next year following the implementation of redevelopment plan. Overall, the site will evolve substantially from a simple layout into a more advanced and multifunctional area with the introduction of new gates, shops and a sky train.

    The redevelopment plan primarily consists of the expansion of gates, introduction of several new facilities, in particular a sky train and a car hire service. To begin with, currently there are eight gates, which will be expanded dramatically, reaching 18 next year. In the northern section, walkways will be replaced by sky trains as a part of redevelopment plan. In contrast, security passport control and passport control customs area will remain unchanged in the same location. In the north-western area, new shops will be placed next year.

    Turning to south-eastern area, an ATM, a cafe and car hire facilities will be installed, and the area will be expanded slightly towards the south. In the opposite corner, the existing cafe and check-in will be relocated to the eastern corner and southern site, respectively. The latter’s previous location will now be serving as bag drop. In addition, the number of departures and arrivals will be doubled, in both the south-eastern and south-western parts of the airport.

  3. FAREED says:

    The plans illustrate the current layout of Southwest Airport and how it will appear after redevelopment next year.
    Overall, the airport will experience significant expansion. The number of gates will increase, and several new facilities such as shops, a sky train, an ATM, and car hire services will be added, making the airport more modern and convenient for passengers.
    At present, the airport has a simple structure with eight gates, which are connected by a walkway. The terminal building is divided into two main sections. On the left side, there is a security check and passport control area leading to departures, along with a café. On the right side, passport control and customs are located for arriving passengers. There are no additional passenger services apart from check-in and a café.
    After redevelopment, the airport will be considerably larger. The number of gates will double from 8 to 16, arranged in a Y-shaped layout. A sky train will be constructed to connect the terminal with the gate areas. In addition, shops will be built near the security area. New facilities such as a bag drop, ATM, and car hire service will also be introduced, particularly in the arrivals section. Overall, these changes will improve passenger movement and services at the airport.
    Band 9

    1. Maavia says:

      can you share your contact detail, i want to contact you

  4. carla font says:

    The plans below illustrate the redevelopment plans for an airport site for the upcoming year.

    Overall, it is clear that the airport will undergo numerous changes, starting with the refurbishment of the boarding gates, which will sharply increase, going from the 8 existing ones to a total of 18. These will be connected by a sky train that will enable faster arrival and will also ensure a better experience for disabled people. The departure and arrival doors will also be doubled; this will avoid queues, especially during the holidays, when the airport gets really crowded.

    In addition, the airport terminal will also add some services, such as an ATM, a car rental, and a bag drop zone, which will be really useful for foreigners who need to change money or rent a car for their stay. Moreover, the terminal is going to include some shops to make the wait more enjoyable for travellers.

    Taken as a whole, the figures show that the airport will be much more helpful and practical for tourists and citizens, who will not only have all the necessary places to organize their trip but will also have some places to disconnect in case of a delay. BAND 8

  5. Debaj Haider says:

    The given diagram demonstrates the area of an airport now and how it will look after the renovation.

    Primarily, it is significant to note that currently there are only two entries to the airport: one for departures and the other for arrivals. These will be converted to four entries. The Departure area now has only check-in and a cafe, but it is observed that the check-in area that is present on the left side will be replaced by a Bag drop and will be reconstructed on the right side. The cafe that is present on the right side will be rebuilt in the west-south corner of the area.

    Additionally, in the arrivals area there is nothing present, but in the future, another cafeteria will be constructed, and an ATM machine will be placed on the left side of it. The car hire area will be on the southeast side of the arrivals site.

    Moreover, the Walkway area present on the back side will be converted to a sky train area.

    To summarize, the airport area in the future will be extended, and more facilities will be provided to the public.

  6. Yetunde says:

    The sketches show the region of an airport presently and how it will look next year after renovation.

    Overall, it is significant that the number of gates will be more than double and the walk way will be moved from the side to the middle of all gates.

    To begin with, the departure and arrival which have an entrance presently will be expanded to two each. Also, the check in which is on the left side of the entrance will be replaced with a building where all travel bags will be dropped and a Cafè will be constructed below it. At the arrivals, another cafeteria will be situated at the far end with the automated teller machine gallery beside it.

    Furthermore, the security post, passport control office and customs clearance arena will remain the same after refurbishment while marts will be built on the road that leads to the gates. Finally, the gates which were initially eight in number and built in a block shape will become Y shape and ten more gates will be included.

  7. Nicola de petris says:

    The maps compare the plan of an airport today and the plan with the improvements that will be introduced next year.

    Overall, it is noticeable that the airport will be significantly extended in terms of gates. In addition, several basic amenities will be added.

    In detail, the zone dedicated to arrivals will be enlarged, and inside it new amenities will be added such as an ATM, a cafe, and ultimately, a car hire service. The same pattern will be observed in the departures part. While currently there are only a check-in zone and a cafe, next year will be implemented.

    By comparison, the zone dedicated to security controls will remain unchanged. However, after a person overcomes these controls, will be able to visit a new store that will be constructed next year. The most considerable change will be observed in the gates area. Ten gates will be added and with them a sky train for moving between each gate.

  8. Emmanuel Sarfraz says:

    The two diagrams illustrate what the Southwest Airport looks like now and how it will be after the renovation next year. Overall, gates are extended from 8 to 18 and walkways are replaced by SkyTrain, whereas the arrivals area with limited amenities previously will have more facilities like cafe, ATM, and car hire services. Currently, the airport consists of two gates, departures on the left and arrivals on the right. After the arrival door, there is a vacant area that goes towards the passport control customs area. However, after the departure gate, the check-in counter is on the left and the cafe on the right, just before the security passport control area. In addition, there are eight gates starting from left to right and a walkway between them. In contrast, after the modification arrival area, which was vacant, have car hire, atm and another cafe on the right side respectively whereas. In departure area cafe changes its place to entrance gate on the left and the bag drop area is added by takes place of check-in counter which takes place of cafe. Similarly, other things are same except the gates which are extended from 8 to 18 make a Y-shape from right to left and a skyline instead of walkways between them.

  9. Usama Khan says:

    The project displays the current situation of an airport site and how it will look after renovation next year.

    Overall, the current plan shows a simple map of the airport. There are 8 gates, two walkways, and two main areas in the airport. After the entrance, there is a security check, passport control, and check-in area at the airport, and a cafe also exist inside the airport in the departure area. After that, the arrivals area is simple: passengers check through customs and passport control. Furthermore, the airport planning after modification next year illustrates some major changes, such as the gate numbers being increased from 10 to 18 and the area being extended next year. Moreover, the sky train will enter the airport, shops will exist before the security area, the check-in area will be replaced by a bag drop counter, and cafe will be replaced by check-in area in the main departures place. There are just three additions in arrivals area car hire in corner, ATM cafe will exist in arrivals area.

    To sum up, there are simple but big changes in the next year project which gives information about airport advancement.
    band 7

  10. Farman Ali says:

    The illustration compares the current view of Southwest Airport and how it will look, after redevelopment in next year.

    Overall, the redevelopment of an airport in the next year will have more features and changes then the new existing one.

    As compared with the existing view of an airport, it has 8 gates connected by a walkway and the new one has 18 number of gates linked by skytrain.

    Shops will also be added just before the security area in the planned new development while the current one has no shops.

    At present, the depatures section contain no bag drop area which is being modified with new bag drop facility beside the check-in counters, while the café remains in place.

    In the new layout the arrival section included the new features like cafe,ATM and the car hire, one of which exist in the current layout.

Our system is processing your request...
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible and free for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
1000+ IELTS Tests & Samples
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & Content
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
279,000₫ 157,000 ₫ cho gói 1 tháng (chỉ 5,233₫/ngày)
819,000₫ 397,000 ₫ cho gói 3 tháng (chỉ 4,411₫/ngày)
1,649,000₫ 667,000 ₫ cho gói 6 tháng (chỉ 3,706₫/ngày)
3,299,000₫ 857,000 ₫ cho gói 12 tháng (chỉ 2,381₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.