The two maps illustrate how the layout of a school campus changed between 2005 and 2015.
Overall, the school underwent significant redevelopment over the ten-year period, with a clear shift towards expanding educational facilities while reorganizing recreational and support areas.
In 2005, the campus featured a large assembly area in the centre, with the secondary section located to the southwest and the auditorium occupying the northern part. A parking area was situated to the west of the auditorium, while the kindergarten (KG) section was positioned to the east.
By 2015, notable changes had occurred. The parking area was removed, and the auditorium was expanded westward to occupy this space, indicating increased capacity for large gatherings. The assembly area was significantly reduced in size, making room for additional academic buildings. Moreover, a new primary section was constructed to the east of the campus, replacing part of the former open space. The secondary section remained in the same location but was slightly redesigned.
In summary, the school evolved from a layout dominated by open and multipurpose areas into a more academically focused environment, with greater emphasis on classroom space and infrastructure development.
