The given line graph illustrate the number of manufactured and demand of steel and the information about labour in the steel company in one areas during 2010.
In an arching overview, it is noticeable that the vast majority of amount produced was higher than actual required, while the number of employees was downwards line.
According to amount manufactured, there maximums figure was 5000 million tons at the February point. Followed by march that gradually drop to about 4000 and then remained constant between April and July. Moreover, the line started increased again at August to November to nearly 4900. However, it significantly decreased at low point at December at 800 million tons. Moving on to demand line, it is clear that it sharply fluctuates in this line and the greatest point is march to around 3000, in contrast the lowest point was September by 0 million tons.
In number of worker employed, the highest experienced of worker was February 5700 people. In addition, in April and august constituted 3000 and 3500. Lastly, the line hit the lowest in December at 2000.
