The maps illustrate the current layout and planned of the biomedical campus at a university.
It is clear that, the biomedical will witness significant changes. In addition, the main road will transform and more buildings will be added.
The main road now between two side of educational land will be demolished in the future in order to combining two into one. In the top right-hand corner of the maps, car park will be converted into student car park, which is smaller. The lab will remain unchanged during the development of the biomedical campus. The genetics will be reduced the size, while the biotech will be expanded in the future.
In the left of the maps, the lab will be decreased size to pave way for Biochemistry expansion. Moreover, the second genetics will be added in the vacant land in the top left-hand corner, beside it is the biomaging as well. The staff car park will be established in the bottom left-hand corner of the map, seperating from biomedical campus by the main road.
