The picture above portrays the step by step instructions on how the building industry creates bricks for future constructions.
Overall, it’s evident that the whole process takes about 7 consecutive steps. clay starts from being excavated from the ground all the way to getting packed for the future delivery. During the several stages bricks undergo sorting, drying under different temperatures and cooling before being transported
in regards of the initial steps, after being sorted through a metal grid the output material is mixed with sand and water. Proceeding further, the compound is either formed into a brick through a wire cutter into equal shapes or put in a special mould. Continuing, bricks are layered into a block inside of a drying oven where they are left for approximately 24 to 48 hours. Then the bricks cool for another 48-72 after which production is over.Notably, the drying is starting at 200, ramping up to 980 degrees and then adds another 300 degrees to complete the drying process. After that, the bricks are packed into several blocks and are ready to be delivered
