The line graphs illustrate the production and demand of steel in million tonnes along with workers employes in steel production plant in the UK, in 2010.
overall, the production was highest in Feburary with 5000 metric tones while, in December it reached in lowest point with 900 metric tones. the demand starts fron 2000 metric tones with frequent ups and down and reached 0 metric tones in November, however succeded to gain its position in December with 2000 metric tones. The number of workers in plant fall dramatically with 5000 from January and 1000 only at the end of the year.
The production amount initiated with 4000 metric tones and seen its highest position in Feb with 5000 metric tones. Then a fall start and the production was steady from March to July with minor dowmfal in April. In August, it was reached at 3200 metric tones and then surge it’s production and reached at 4800 metric tones in September. After that, a highest downfall started and it reached at its lowest position in December with 900 metric tones only. The demand incresased from January to March, from 2000 milion tones to 3000. However, it’s number decreased and fall at 1800 million tones in May and again a upward trends started and its succeeded to maintain it’s demand. Whether, with fluctuations it’s fall on lowest point in November with 0 million tones but started gain its position and then reached in 2000 million tones again in December.
The amount of workers who employes in steel plant was 5000 in January and 5600 in February and downward trend was seen and it fally frequently and reached its lowest position with 1000 workers only.