🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: The Map show the South wing of Walton museum in 2008 and in 2012 after redevelopment

Image for topic: The Map show the South wing of Walton museum in 2008 and in 2012 after redevelopment
Our system will evaluate the answer based on this AI-generated description.
The image shows two floor plans of the South Wing of Walton Museum, one from 2008 and the other from 2012 after redevelopment. Both plans feature a central hall with three rooms on the right side and two rooms on the left. In 2008, the rooms on the right were a Reading Room, Shop, and Cloaks Room, and the left side had a Special Exhibition Room and stairs. In 2012, the right side rooms became an Exhibition Room, Shop, and Cloaks Room & Reception, while the left side had a Special Exhibition Room and a Historical Play Area. The stairs were removed in 2012. No numerical data is provided.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The diagram provides a comparison between two sites of the South Wing of Walton museum before and after redevelopment, respectively.

Overall, the renovations indicate a significant development of the museum between 2008 and 2012, both expanding the old spaces and adding new rooms.

Firstly, the shop and the special exhibition room are remained unchanged, while the cloaks room moved on the second floor next to the reception. In 2012 this space was allocated to the children play area. On the second floor both layouts demonstrate the same position of the reading room and reception, although the introduction of the entrance hall in 2012 is to notice.

After redevelopment, the museum has been impressively expanded by inclusion of two additional levels above. The third floor is characterised by a presence of a terrace, a restaurant, and a self-service room, indicating the enhanced infrastructure of the museum. Eventually, the entire last level is dedicated to the exhibition room.

Furthermore, it is notisible a substitution of stairs with an elevator and providing a triangular roof for the building. Beyond the museum was kept the same path like in 2008.

Word Count: 186

Answers On The Same Topic:

The Map show the South wing of Walton museum in 2008 and in 2012 after redevelopment

The provided map shows the current layout for the south wing of Walton Museum in 2008, and future development in 2012. Overall, the proposal changes generally expanded larger than before, with the addition of rooms, services and infrastructure supporting better and convenient experiences. Notably, the replacement of lift for stairs and the disappearance of the […]

The Map show the South wing of Walton museum in 2008 and in 2012 after redevelopment

this is the South wing of Walton museum which is the map show in 2008 and in 2012 after redevelopment Overall, there are numerous rooms and interiers have changed after just entering the entrance there was not huge reception and instead of lift there were stairs. Actually it was not big in 2008 in 2012 […]

The Map show the South wing of Walton museum in 2008 and in 2012 after redevelopment

illustration depict the South Wings of Walton Museum in 2008 and after it was redeveloped 2012. Overall, the south wings of Walton Museum was totally changed in 2012 according to the plan demonstrates. Specifically give it a well design, add more rooms, Restaurant, Terrace, built LIFT instead of stairs and many more changes. In detail, […]

The Map show the South wing of Walton museum in 2008 and in 2012 after redevelopment

The plan illustrates that South Wing of Walton museum is after the redevelopment from 2008 to 2012. Overall, There is a big change in plan in 2012. Actually, there was only two portions in the building, The basement and first floor. However, there is two more floors have been built in 2012. In detail, The […]

The Map show the South wing of Walton museum in 2008 and in 2012 after redevelopment

The map compares information about the south wings of walton museum in 2008 and in 2012 after it was developed. Overall, the museum underwent segnificent changes becoming more developed in 2012 such as lift , terrace and restaurant have been made. In detail, the south wing path in 2008 and in 2012 it remained the […]

See All

Other Topics:

The maps below show the village of Stokeford in 1930 and 2010. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The figures illustrate the village of Stokeford in 1930 and 2010. It is clearly seen that, there were more new houses constructed in 2010 compare than 1930. The farmland totally dispelled while, one tree was cut and removed from the garden and only two trees still located in the same place. The primary school to […]

The maps below show the changes that have taken place at the waterfront area of a town called Darwin between 2009 and 2014.

The provided maps depict the transformation of Darwin’s waterfront area between 2009 and 2014. A perusal of the maps reveals significant redevelopment, particularly in the southern section, while the northern part experienced more localized changes. Overall, the waterfront evolved from a more industrialised zone to one with enhanced recreational and educational facilities. In the northern […]

the diagram below shows the plans for designing a trade sho floor from 2009 to 2010

The diagrams compare the layout of a trade show floor in 2009 with a revised version planned for 2010, highlighting changes in the size and position of various facilities. Overall, the most striking change is the reallocation of space between the exhibition area and the conference hall: the former has expanded considerably, while the latter […]

The diagram below shows the changes of the town named Shakefield from 1995 until now. Summarise the information by selecting and reporting the main features, and make comparison where relevant.

The two maps illustrate the changes made to the town of Shakefield from 1995 to the present. Overall, the site has been completely redeveloped since 1995, shifting from a small coastal settlement with farmland and fishing facilities to a more developed residential and tourist area with new accommodation and infrastructure. In 1995, Shakefield was a […]

The diagram shows Lakeside development between years 2000 and 2009.

The two given maps illustrate modifications of the Lakeside area between 2000 and 2009. Overall, this area underwent extensive redevelopments, with commercial, educational and office facilities being constructed. Notably, the natural landscape was reduced in size to make way for an expansion of the industrial complex and there was a clear separation between this complex […]

The maps below show the centre of a small town called Islip as it is now, and plans for is development.

The given two maps illustrates the present area of Islip town centre and how it is expected to develop. Overall, the place is expected to have a significant transformation from residential to some addition of shopping centre and new housing. In the first map, to the north side shops is located while the main road […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.