The maps illustrate the variation of a school layout from 1985 to present. Overall, it is clear from the maps that the biggest change that occurred in the village was the construction of several facilities, including fitness center, classrooms and learning resources center. In addition, the playing fields are minimized in size.
In 1985, the school had a rectangle car park near the main road to the north and a road linked between it and playing fields to the south. On the left of the map, a variety of facilities were situated, including an office, a library, a small car park and classrooms, but there was only a classroom block with two floors located on the opposite side.
Moving on to the present day map, the school’s students have increased from 1500 to 23000 since 1985. Besides, the large car park is transformed into a curved shape and the small road disappears to make way for a group of trees. In the same year, apart from the office, all the facilities on the left side are destroyed and replaced by a learning resources center, new brand classrooms and a fitness center housing an indoor pool. Meanwhile, the classroom block is turned into 3 storeys and more classrooms are constructed next to it.