The given two plans illustrate the differences between the same theatre in 2010 and 2012.
Overall, the theatre after modernisation was expanded in the upper and lower parts. Moreover, the middle was also enlarged by adding more seats. Furthermore, some rooms were added to facilitate visitors’ experience.
In 2010, the theatre featured a simple layout with some rooms. In detail, at the top of the plan there was a stage, dressing room right behind it and a storage unit on the upper-left side. The main door was accompanied by a cafe at the right side and admin and ticket offices on the left side.
In 2012, the building faced significant renovations. The main area with seats was extended and admin office was moved to the left side right next to the it. The lower-left side was taken by a large restaurant, consequently, the ticket office was placed on the lower-right side of the plan. Ultimately, the most noticeable changes were made at the upper side of the layout. The storage room was relocated to the upper-right side and its former location was taken by the dressing room and the showers. Moreover, a corridor was built behind the stage.
