The blueprints illustrate the modification of a small performance venue in 2010 and 2012. Taking a board view, there are some notable features including the relocations and renovations of almost all facilities except for the auditorium. In the meanwhile, the construction of a new area in place of the old one is also noteworthy.
In the south of the theater, there was a main entrance which remained intact during the two-year period. Through the entrance, the audience could access the management area for buying tickets. These areas initially included an admin office and a ticket booth located at the left corner and opposite a beverage zone. After being renovated in 2012, the admin office and a ticket booth was separated into 2 sides of the entry, the former was in the northwest, and the latter in the southeast. Notably, the small cafe was incorporated into a large dining area that was equipped with chairs for people to take a seat. This new restaurant was sited south of the admin office.
Going to the north, there is an auditorium which remained untouched overtime. The stage located in front of the auditorium was doubled in size in 2012 compared to 2010. The storage was moved from the west to the east of the facility, making way for a media room and bathing area. In Addition, a new hall was introduced right behind the stage in 2012.
