The maps illustrate the changes of a small theater layout over a 2-year period between 2010 and 2012.
Looking from an overall perspective, it is clear that the layout of the theater witnessed remarkable developments. Most noticeably, the expansion on the two sides and the introduction of the restaurants.
As observed, on the right of the main entrance, the cafe store was replaced by a ticket office. Next, the position of the admin office was moved to the top left of the lobby because of the establishment of the restaurants. At the centre, the auditorium remained constant with the addition of a shower room on the left-hand side.
Furthermore, the main stage demonstrated the expansion by a quarter to enhance the performance experience. At the top, there was a slight change from the media room to the hall. Lastly, while the storage was moved to the top right-hand corner, the current location was used for the media room.
