The map illustrates the layout of the office building, which was altered to make way for a dental clinic.
Overall, it can be seen that all 4 office rooms were turned into treatment rooms, while reception and storage remained untouched.
If we look at the details, the model of the office building had not been entirely revamped. The entrance was located to the west of the building, and reception on the left side with the storage on the right side of it, for example, stood unchanged. The toilet in the office building, however, was connected to the storage in the clinic, and sterilization was created where the toilet used to be. Turning to the office rooms, all of them were transformed into the treatment rooms; even the open-plan office, situated in the northeast side of the office, was also covered with walls and turned into one big treatment room. Additionally, there was no kitchen anymore next to the reception in the clinic, as it was also replaced by a treatment room.
