The given maps provide information about how an office building was altered to a dental clinic.
Overall, a comparison of the two maps reveals that an office building underwent a number of changes like repurposing and relocation. Additionally, by constructing more rooms for services, it has made use of space more efficiently.
In the original layout of the building, there were fewer rooms compared to the new one. Office 2 was situated in the heart of the building, flanked by a Storage to the west side of the map and an Office 3 to the east. There was a toilet to the south from Office 2. Although there was an open plan office in the north-eastern tip of the picture, the north-western part consisted of reception, kitchen and Office 1.
Renovated version of a building has been modernized in many ways. The Office 2 which was in the middle of the building was transformed into Treatment room 3. Even though the toilet formerly located in the south was supplanted by a Sterilisation, the size of the storage was reduced in order to make room for the toilet. The eastern part of the building was wholly repurposed by turning the open plan office from the left and Office 3 from the right into Treatment room 2 and Treatment room 4 respectively. When it comes to the Kitchen and Office 1, they were pulled down and substituted with Treatment room 1. Eventually, the only building left unspoiled was the reception.