The map illustrates the significant transformation of an office building into a dental clinic, showing the changes made to the internal layout of the same building.
Overall, the building underwent a considerable redesign of the interior, with all offices being converted into medical rooms, while some areas such as the rêcption, toilet, and storage remained unchanged.
As visitors step inside, to the right, a spacious room for storage is reduced in size to accommodate for toilet. On the opposite side, a block of treatment room 3 and sterilization now stands where used to house office 2, and the toilet.
Continuing towards the other area, the reception remains unchanged; meanwhile, a chain of treatment rooms from 1 to 4 has been erected and upgraded, which stretches halfway. The space for the kitchen and office area was to be demolished, and given way to a modern healthcare room.
