The plans below illustrate what an airport show in the present and what it will be look in the future; specificaly, after two years from development.
Overall, the airport now has a simple places. While in the future a lot of places will be added, and they will be more modern.
Nowadays, on the south-eastern side of the airport, there is simple layout with two main sections, firstly, in departures are located security, passport control, and check-in areas. Secondly, in arrival area are located the passport control and customer assistance. Moreover, there are eight gates at the top of the airport accessed via walkways. In addition, there is only one cafe in the departures area.
However, there are expectation about how the airport will be after redevelopment. The airport layout will change significantly. Firstly, the departures area will have facilities; for instance, bag drop (switched places with check in), a cafe, an ATM, and car hire. The same happen will in the arrivals area. The number of gates will increase, accounting for 18 gates. Also, a large number of sky trains will be added.
