The process depicts the design of a modern landfill for household waste.
Overall, the data reveals that process consists of 3 main stages namely, construction, use and closure, starting with preparation for landfill, and ending with closure. Moreover it is likely can be a complex process, since it involve special equipment
According to the process, it starting with that it is dug a man-made hole in natural rock, then it covered by clay and synthetic lining, after that it is put drainage pipes and drainage tank are added on the bottom.
In The next stage household waste is transported by trucks and put into the landfill. As the waste accumulates, liquid is produced. Finally step, when the landfill is full, it is closed. A clay cover is placed on the top of the waste. Then pipe is put up to gases can go out.