The given maps illustrate planning of Bunborough village in the current time and plans for 2024.
Overall, plans for the village in 2024 include appearance of new buildings and transportation routes. At the same time, amount of shops and position of some houses won’t change.
Main changes for 2024 include addition of another road, that branches from the main road from Lynwich and will go near beach towards the Bunborogh. Another novelty is a raillway, that will go through village towards Lynwich. Due to it’s route, two houses will need to move on the other side of the road, that currently connects Bunborough to Manchester and Lynwich. Additionaly, there would be two hotels in the village and fishing port will be rebuild into promenade.
On the other hand, area with 7 shops will remain untouched. Same goes for 4 houses, that are located on the other side of the road from shops.
