🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: The maps below show the future plan about the Biology School in particular university. Summarize the information by selecting and reporting the main features, and make comparisons where relevant

Image for topic: The maps below show the future plan about the Biology School in particular university. Summarize the information by selecting and reporting the main features, and make comparisons where relevant
Our system will evaluate the answer based on this AI-generated description.
The image contains two maps for 2015 and 2020 showcasing changes in a university's Biology School. In 2015, a central road divides the area, with a central library, drama center, IT center, teaching building, café, lecture room, and indoor sports hall. Trees and curved paths decorate the area. By 2020, the drama and sports centers are replaced by a music center, lab, and office buildings, and a car park for staff is added. Roads and building placements remain consistent, aside from the café moving next to the lecture room.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps depict the future modifications which took place in the Biology school at a university.

Overall, the layout of Biology school will undergo marginal changes, primarily involving the removal of several trees, and the addition of many facilitities to cater for student needs.

According to relatively marginal modifications, a road running from the north to the southwest has remained unchanged. Similarly, no changes are likely to be observed in cafe, IT central, and indoor sports hall; the two formers are located in the bottom right-hand corner,while the latter is situated in the top right-hand corner of the campus. Additionally, in the heart of the school is central library, which is predicted to stay the same, facing a drama center that is likely to be converted into a new music center.

As for the remaining changes, there are several trees positioned to the south of the road, that are anticipated to be chopped down to make way for a new car park for staff. Similarly, a row of trees at the top of the campus are forcast to make space for a new lab and office. Finally, a new building and lecture room are expected to be erected opposite the old ones.

Word Count: 202

Answers On The Same Topic:

The maps below show the future plan about the Biology School in particular university. Summarize the information by selecting and reporting the main features, and make comparisons where relevant

The maps illustrate how the Biology School at a particular university is planned to change between 2015 and 2020. Overall, the site is expected to undergo considerable redevelopment, including the construction of new academic facilities, the reorganization of some buildings, and the reduction of green areas to make space for functional infrastructure such as a […]

The maps below show the future plan about the Biology School in particular university. Summarize the information by selecting and reporting the main features, and make comparisons where relevant

The given picture demonstrates the diferent that ar carried out about the biology school in a pảtiular university from the present to the future Overall , this is clearly evident that this area witnessed singficnt changes to become more mordern . apparently , the green space was exteded during the period of time To start […]

The maps below show the future plan about the Biology School in particular university. Summarize the information by selecting and reporting the main features, and make comparisons where relevant

The map shows the change of biology school in a particular university. Overall, it can be seen that the major changes of car park for staffs, it build in the south west corner and in the north new construction of lap and office. While the music dramas centre conversation to music center. To begin with, […]

The maps below show the future plan about the Biology School in particular university. Summarize the information by selecting and reporting the main features, and make comparisons where relevant

The given pictures depict the proposed changes to the Biology School at a university. Overall, while the road, indoor sports hall, and central library will remain unchanged, significant developments are planned, particularly to the south and northwest areas, with the addition of new facilities and significant reduction of green space. In detail, most trees located […]

The maps below show the future plan about the Biology School in particular university. Summarize the information by selecting and reporting the main features, and make comparisons where relevant

The given maps illustrate the main modifications that will be made to the Biology School in a particular university. Overall, it appears that the Biology School will undergo significant renovations, including the introduction of the lab and the office, and the change of some facilities. The most noticeable change is that in the south, many […]

See All

Other Topics:

The maps below show the recent changes in the town of Kim's villein.

The presented maps illustrate recent changes from 2002, to today in the Town of Kimsville. Looking from an overall perspective, it is clear that the city has modernized over the last 24 years. Moreover, new facilitiy was added such as new train station, by contrast, green areas, old cinema, and factory were replaced by new […]

the diagram below shows the plans for designing a trade sho floor from 2009 to 2010

The maps illustrate that plans for projection show floor over the period of 2009 and 2010. Overall, it is clear that conference hall has undergone significant changes over the period, with exhibition area being the most notable development. In 2009, the area was predominantly undeveloped. There was a registration which transformed for refreshments now. Furthermore, […]

Summarise information by selecting reporting the main features and make comparisons where relevant

These two maps illustrate a health centre throughout 2005 to the present day, located in the same place. Overall, the building shape changed to a square shape, new rooms were added, the car parking lot was increased, and there were other major changes. The first picture shows that the entrance was in the center of […]

The pictures show the layout of a cinema in 1980 and the same cinema now.

The maps depict how a cinema changed between 1980 and until now. Overall, the cinema underwent a significant transformation, with the addition of three extra cinemas, a DVD shop, and a relax room. In 1980, there were a room for tickets and a shop for drinks to the right side of the entrance and cinema […]

Writing Task 1 You should spend about 20 minutes on this task. The maps below show a bookstore in 2000 and now. Summaries the information by selecting and reporting the main features, and make comparisons where relevant. You should write at least 150 words.

The map presents information about the layout of the bookstore in 2000 and now. It gives a clear understanding of different sections of the bookstore and their position in the store. Some of the sections remained at the same position such as Travel, New books, and Service desk. The entrance of the bookstore remained same […]

The diagram below shows the changes of the town named Shakefield from 1995 until now Summarise the information by selecting and reporting the main features, and make comparison where relevant

The map demonstrates information of Shakefield town since 1995. Overall, the elimination of farmland, green space, sports complexes, and a fishery has created space for the establishment of a golf course, tennis course, cottages, parking area, vacation homes, eateries and yachts during the period. Additionally, the remaining areas – apartment complexes, hotel and coffee shops […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.