The map illustrates a tiny theatre in 2010, and its changes in 2012.
Overall, it is clear that the theatre has undergone some enourmous changes, switching from place, which offers basic amenities to tourist based destination, with descreasing territory of stage, replacing admin office and ticket office with restaurant.
Before the transformation, inside the theatre, it consisted of only a dressing room, stage on the north side, auditoruim just on the centre and ticket, admin office, cafe with the main door on the south. As on the outside storage was built on the north-west side of it.
According to the plan in 2012, only auditoruim and main door was unchanged. The most significant development was the extension of a stage on the north side of the theatre, where it overtakes land previously occupied by dressing room. The dressing room too was replaced with corridor to make way for the other side of stage freely. Admin office along with ticket office on the south-west displaced with restaurant. Also admin office had moved to outside, where it is right next to the auditorium, and to restaurant. However ticket office replaced the cafe, which was located on the south-east side. Outside the theatre, although the renovation allowed more convenience, including dressing room and showers, which is next to stage and corridor on the west side, but storage on the east side. A shower was added, which is under the dressing room.
