The diagram illustrates how the layout of a small theatre was redeveloped between 2010 and 2012.
Overall, the building undergone significant improvements. Traditional staff areas was replaced, creating more space to community activities.
In 2010, most of the theatre’s floor area was devoted to membership and workplace. The main entrance was located at the bottom of the plan, leading directly to a foyer. A café was located to the right of the entry point and an admin office with ticket office was on the left. The area above the foyer was accommodated as auditorium. There was a room at the upper corner designated for a stage and one at the upper left corner for storage, right above the stage was located a dressing room.
By 2012, the facility witnessed extensive renovation. The entrance remained at the bottom, but the former admin office was replaced by a restaurant and the tiny café on the right of the main doorway was converted into a ticket office. The central auditorium area stayed at the same location, introducing an admin office on the left above the restaurant. Notably, the storage was relocated to the upper right side of the plan, providing space for a dressing room and showers. In addition, the stage was extended, leaving small area to a corridor.
