
Our system will evaluate the answer based on this AI-generated description.
The image presents two floor plans titled "Southwest airport", comparing "NOW" and "AFTER DEVELOPMENT". In the "NOW" layout, the bottom section is split vertically into DEPARTURES on the left (with a single entrance, a "Check-in" (C) area on the left, a "Café" icon on the right, and "SECURITY" and "PASSPORT CONTROL" partitioned above) and ARRIVALS on the right (with a single exit and an upper partition for "PASSPORT CONTROL" and "CUSTOMS"); extending upward is a straight corridor containing a "Walkway" between two walkway icons and lined with gates numbered 1 to 8 (Gates 1, 2, 3 on the west side; 4 and 5 at the north end; 6, 7, 8 on the east side); its legend lists "(C) Check-in", "Café", "Walkway", and "[1]-[8] Gates". In the "AFTER DEVELOPMENT" layout, the departures area features two entrances, a "Bag drop" (B) along the western wall, a "Café" in the southwest corner, "Check-in" (C) near the central partition, "SHOPS" along the upper angled wall, and "SECURITY" and "PASSPORT CONTROL" above; the arrivals section features two exits, an upper "PASSPORT CONTROL" and "CUSTOMS" area, a "Café", an "ATM" ($), and a southeastern extension housing "Car hire"; the central concourse expands into a Y-shaped pier featuring a central "Sky train" track between two train stations, serving gates numbered 1 to 18 (stem west side: 1, 2, 3; northwest branch outer side: 4, 5, 6; northwest branch end: 7; northwest branch inner side: 8, 9; northeast branch inner side: 10, 11; northeast branch end: 12; northeast branch outer side: 13, 14, 15; stem east side: 16, 17, 18); its legend defines "(C) Check-in", "(B) Bag drop", "Café", "[$] ATM", "Sky train", "Car hire", and "[1]-[18] Gates".
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The map displays information on the differences in the southwest airport facilities between now and its scheduled improvements next year. Overall, the new airport plan includes significantly more gates, the introduction of sky train, an ATM, a car hire point, and new shops.
One noticeable addition is the increased number of gates and total area, which was 8 and now being 18. Moreover, in departures, you can now visit new shops after the new sky train before heading to security. Other additions were the bag drop and a new entrance to increase them from one to now two. We can also notice the relocation of the cafe from being in the west area to the east in the redevelopment plan.
In arrivals, there is also an additional entrance accompanied with a car hire, an ATM, and a cafe that were not found in the current airport area. After that passengers can use the newly introduced sky train in the geometric shape location compared to the old dull rectangle shaped one.
Word Count: 170