The picture illustrates a health centre before and after the constructions of several facilities between 2005 and today.
Overall, the health centre witnessed radical changes with the most noticeable being the development of the structure building and the change of the external centre.
In 2005, the car park was located in front of the building and contained 12 spaces. However, in the present day, this area is significantly extended to 30 spaces for parking while the garden witnessed decline in size. With an alternation size, a Minor operations room is built to fill a part of the vacant garden. The entrance has also relocated from the south to the west of the centre.
Going into the health centre, the structure of these rooms recorded several changes. From the new entrance, the reception desk was removed from the middle of the center to the left of the entrance. A children’s play area is also constructed opposite the reception desk. The pathway directed into the waiting area, which has more seats in the present day. Moreover, the Office is modified and the old CR3 was relocated by the changes of the entrance. Beside the restructure of the pathway, the Consulting room are reorganized. In the east of the centre, the new CR4 replaced into the CR2, old CR1 next to the old CR2 replaced by the CR3. To the north of the new CR4, the Physiotherapy room remains unchanged, which locates beside the Minor operations room now. The CR1 is relocated opposite the new entrance, while the CR2 was removed midway between CR1 and CR3.
