The map illustrates the changes that occufred in the plan of a medical centre between 2008 and 2010.
Overall, it can be observed that the hospital underwent a renovation to enhance the center’s services. While the location of core areas such as laboratory and the reception area remained unchanged and others were expanded, new facilities such as a pharmacy, a store room, an education room, and a mother and child room were added.
In 2008, the medical center consisted of a treatment room and three doctor’s office arranged at the center of the corridor. To the left of the corridor there was a staff office and the reception area. Through the main entrance, there was a laboratory to its right and beside it, there was a waiting room.
By 2010, several changes were made to the layout of the center to provide improved and well-managed facilities. Two new rooms were added to the left of the treatment room: an education room and mother and children rooms, improving the versatility of the hospital. The length of the corridor was extended to accommodate a store room, adjacent to a new doctors’ office. A pharamacy was introduced next to the laboratory, reflecting an increase in range of range of services. The overall layout became more organized and efficient.
