Our system will evaluate the answer based on this AI-generated description.
The image displays a flowchart detailing the process of straw bale house construction. It begins with "Previous building demolished and ground prepared," followed by "Concrete stem wall," then "Straw bales." The subsequent step is "Roof and external finish," leading to "Internal installation," which breaks down into three components: "Electrics," "Plumbing," and "Insulation." After these, there is a "Structural inspection (Buildings Officer)" step, followed by "Decoration (painting, carpet, curtains, etc)," and the final stage, "Furnishing (white goods, furniture, entertainment systems)." Each step is consecutively connected with arrows indicating the flow of the construction process. No specific numerical data points or percentages are provided.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The diagram shows how a straw bale house is constructed step by step.
Overall, the process is linear and involves several stages, starting from preparing the land and ending with furnishing the house. One noticeable feature is that the internal installation stage is divided into three parts: electrics, plumbing and insulation.
First, any previous building on the site is demolished and the ground is prepared. After that, a concrete stem wall is built as the base of the house. Then, straw bales are used to form the walls. Once this is completed, the roof is added and the outside of the house is finished.
Next, internal installation takes place. This stage includes three different systems, namely electrics, plumbing and insulation, which are carried out separately. After completing these, the building is checked through a structural inspection by a buildings officer.
Finally, the house is decorated with items such as paint, carpets and curtains. In the last stage, furnishing is done, including adding white goods, furniture and entertainment systems.
Word Count: 168