🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 9: The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

Image for topic: The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image consists of two floor plan diagrams. The top diagram features offices forming a straight line from left to right: three offices followed by a reception area. Above the reception area, adjacent are a kitchen, a canteen, and a stock room, then a WC at the top right. The top plan is annotated with 'entrance' at the bottom side and 'grass area' at the right side, with 'grass area' also at the left side. The lower diagram has an arrangement where the offices are in an L-shape with two offices on the top left and one on the bottom right of the left side. A stock room and WC are positioned adjacent near the middle right, followed by a meeting room at the far right. The bottom diagram boasts 'coffee machine' above the stock room and 'outdoor sitting area' on the far left. The text representation indicates orientation, space allocation, and fixture placement, with no numerical data provided.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The diagrams illustrate the current layout of an office building and the proposed plan for its future development.

Overall, the office building is expected to become more modern and functional. The kitchen and canteen will be removed and replaced with additional office space, while the grass areas will be redeveloped into an outdoor seating area and a meeting room. However, the stock room and WC will remain in the same positions.

At present, the building contains four offices and a reception area along the southern side near the entrance. On the northern side, there is a kitchen, a canteen and a stock room. In addition, two large grass areas are located on both sides of the building, while the WC is positioned on the eastern side next to the stock room.

Under the proposed plan, the kitchen and canteen will be converted into two new offices, increasing the total number of offices from four to six. The reception area will be moved to the centre of the southern side, with one office placed on either side of it. The grass area on the western side will be transformed into an outdoor seating area, whereas the eastern grass area will be replaced by a meeting room. Furthermore, a coffee machine will be installed near the WC in the north-eastern corner of the building.

Word Count: 222

Answers On The Same Topic:

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams illustrate the current layout of an office building and the proposed plan for its future development. Overall, the office is expected to undergo significant internal reorganisation, with more space allocated to offices and meeting facilities, while outdoor and communal areas will be reduced or relocated. In terms of internal layout, the office building […]

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams illustrate the current layout of an office building and the proposed changes for its future development. Overall, the office building will undergo a significant transformation, characterized by the relocation of functional rooms and the repurposing of outdoor spaces to accommodate more professional facilities. At present, the building is flanked by two grass areas […]

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The maps show how an office building looks now and how it will change in the future. Overall, the building will have more offices and a new meeting room. The kitchen, canteen, and grass areas will be removed. Looking at the inside of the building, the kitchen and canteen located in the top-left corner will […]

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams illustrate the current layout of an office building and the proposed plan for its future development. Overall, the building is expected to undergo significant restructuring, with most individual offices replaced by an open-plan working space and several new facilities added, including a meeting room and a coffee area. At present, the office consists […]

See All

Other Topics:

The maps give data about the transformation of the North Avenue between now and future.

Some of the places in the North Avenue that we are seeing now will be chage in the future. The car park that people usually use to park their car while they are attending places Like cinema or the shopping centre will be change. There are two sides of it. One that next to High […]

Summarise the changes to Liverpool John Moores University from 2010 to 2016

The map presents the development of Liverpool John Moores University from 2010 to 2016. Overall, it can be seen that the university has been more equiped in 2016 compared to 2010 with a lots of new building and facilities, such as cafe and bus station. However, it seems like car weren’t allow in the university […]

write about changes e in science park from 2008 years to today

The map illustrates the transformation of the layouts of a sciene park from 2008 to today. Overall, the arrangement of the park has showed significant alterations, becoming more accessible and more convenient for scientists and visitors with the introduction of new modern buildings. In 2008, a big woodland was situated in the southwest, while an […]

the map illustrates how Frenton changed from 1990 to 2012.

The illustrations demonstrate how the town of Frenton evolved over the given period. Overall, the area underwent substantial transformation, with tge most noticeable changes involving green area changes. While several new facilities were introduced and existing structures were redeveloped, some features remained largely unchanged. In 1990, the town contained a school in the northwest, with […]

You should spend about 20 minutes on this task. The maps below show the layout of a town at present and its proposed future development. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The provided two maps illustrate the current layout of the town area and the proposed future changes, highlighting major developments in infrastructure and land use. Overall, it is clearly observed that the area will experience remarkable developments, with a more well-organized layout and the addition of amenities such as a path and a main road. […]

The picture shows the map of a University Sports Centre in 2007 and at present.

The presented maps give information about how a university sports center has changed since 2007. Overall, the center has witnessed a major renovation to upgrade the existing facilities, while introducing new amenities, thereby enhancing the training quality. In 2007, the top area of the center was occupied by a large football pitch that was covered […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.