The map illustrates the layout of the office building as it is now and how it will be modified in the future. Overall, the area has witnessed various transformations, most notably with entertainment, working facilities.
In the beginning, in the southern part of the map, there are lots of facilities, including the kitchen, the canteen and the stock room.
Furthermore, there are green areas on two sides of the figure. The toilet is located in the southeast of the map, east of which lies a grass area. From the entrance, there is the reception, which is near to the office and a flora area. Moreover, to the northwestern part of the building, there are four sections of the office room.
According to the plan, several new facilities will be erected. The kitchen and the canteen will be constructed to be replaced by two official rooms, while the stock room will remain unchanged. To the western of the plan, the grass area will be demolished to make way for the meeting room in the southern corner of the building and the WC, south of which is located a coffee machine. Additionally, the northern area of the figure will be erected on the original site of new facilities, including two office areas and the reception, which is in the middle of them. Finally, the greenland will be cut down to replace the outdoor seating room.
