The two diagrams present the current configuration of an industrial zone in Norbiton and a proposed redevelopment scheme for the same location.
Overall, the area is set to undergo a comprehensive transformation, shifting from a factory-dominated landscape into a residential district featuring civic amenities such as a school, medical centre, and recreational facilities.
At present, the site comprises several industrial buildings concentrated along the eastern side of a central roundabout, which connects roads heading north, west, and south. A river flows along the northern perimeter, creating a boundary between the site and adjacent farmland. Notably, no residential or public infrastructure exists in the current layout.
According to the future plan, all factories will be removed and replaced with housing units. A bridge is projected to span the river, granting access to newly developed residential areas and community services including a school and a playground. Moreover, a new road will be introduced on the western side of the roundabout, providing space for commercial premises and a medical facility. These modifications reflect a shift in urban planning priorities, aimed at enhancing the liveability and social utility of the area.
