Our system will evaluate the answer based on this AI-generated description.
The image displays two diagrams comparing a school site in 2013 with 600 students and in 2016 with 1000 students; in 2013, the layout includes one Car Park, Building 1, Building 2, and a Playground, aligned closely together; by 2016, the school introduces a Road linking Car Park One and Car Park Two, with an additional Building 3, and the Playground repositioned, indicating infrastructure expansion and increased student capacity, as noted by direction indicators showing the orientation.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The maps illustrate the site of a school in 2013 and the future plan in 2016.
Overall, it is clear that the number of buildings has increased, representing the other facilities have devloped as well.
Looking at the maps in more detail, the playground has been replaced into car park two, which is connected to car park one with the road. In the meantime, the original playground has been moved to the southern area, and its size has been increased. In the northearn section, building three has been formed nearby car park two, while building one and building two have been preserved, and its have been connected by a road.
Word Count: 110