Our system will evaluate the answer based on this AI-generated description.
The image shows two plans depicting the layout of Southwest Airport currently and post-development. The current layout includes a security checkpoint, passport control and customs, check-in, gateways, a lift and stairs, and a restaurant, labeled 1 to 6 respectively. The arrivals and departures are located below these facilities. The post-development layout shows an expanded setup with 18 labeled facilities including separate domestic and international check-ins, additional restaurants, shops, a business center, a bank, and a car hire. The security and passport control areas are also relocated, and the departure and arrival areas are above the facilities.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The map illustrates the current structure of the Southwest airport and its future redevelopment plans.
Overall, it is evident that many new services are planned for the future and the number of gates will be increased.
At present, upon passing through the departures gate, only the check-in area is visible on the right side, while the cafe is located on the opposite side. However, after the redevelopment, there will be a bag drop area opposite the check-in counters, with the cafe situated below. Additionally, there are plans to add shops after the security and passport control area.
The future design of the airport includes new services in the arrival area such as cafes, ATMs, and car hire services, which are currently unavailable.
Currently, the airport has 8 gates accessible by walkway. Following the redevelopment, the number of gates will increase to 18, and sky trains are planned to transport passengers to these gates.
Word Count: 153