The present plans illustrated the view of an airport and predicted it’s renovated after a year.
Overall, the airport changed considerably over the time to cater the growing needs of population and various amenities development would take place in southwest airport.
To begin with arrivals there was not any facilities in the present plans while after the development cafe, car hire and ATM would be constructed in it. Furthermore, walkway area in the next renovated would be increase from 1-8 to 1-18. Moreover, In former plans there was not any place for shops whilst In latter plans shops would be erected in the north-east direction
Whereas, Security, Passport control and customs remains same as located in south side of both departures and arrivals. However, check-in would be replaced from West to east side of the departures. Additionally, a new bag drop would be introduced at the west direction of check-in. Besides, a cafe lying under security and passport control would be modernised in the south- west direction.
