Our system will evaluate the answer based on this AI-generated description.
The image shows two plans depicting the layout of Southwest Airport currently and post-development. The current layout includes a security checkpoint, passport control and customs, check-in, gateways, a lift and stairs, and a restaurant, labeled 1 to 6 respectively. The arrivals and departures are located below these facilities. The post-development layout shows an expanded setup with 18 labeled facilities including separate domestic and international check-ins, additional restaurants, shops, a business center, a bank, and a car hire. The security and passport control areas are also relocated, and the departure and arrival areas are above the facilities.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The arrangements demonstrate the current plan of the Southwest Airport and how it will be after the renovation next year.
At the entrance of departures it is visible that there is one door, which is planned to double after renovation. Currently on the west there is the check-in and it will be moved to the east and the place will be replaced by bag drop. The cafe will be moved to the southwest. Security passport control will be in the same spot.
Regarding the arrivals section, the entrance door is expected to be doubled. A cafe, an ATM, and a car hire are projected to be added. Passport control customs will be in the same place.
In the north, right now there are only eight gates after the renovation ten more gates are planned to be added. Currently the access is with the walkway it is projected to be replaced by a sky train. The shops will be expected to be designed.
Word Count: 162