🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Image for topic: The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image is a comparison of the current and planned future development of the Norbiton industrial area. The top map shows the current layout with a river to the north, farmland to the east, and a town to the south with dashed lines marking their boundaries. A factory is located to the southwest with a shaded rectangle representing a housing area and various straight and curved lines indicating roads. The compass rose points north. The bottom map depicts the planned future development with the same river, farmland, and town placement. However, it includes a playground to the east, a circular road with branches leading to various buildings, including what appears to be a housing area represented by shaded rectangles. The roads are more interconnected and there are additional smaller roads or paths.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The two maps compare an industrial location in the city of Norbiton and the same site after it is fully planned and developed.

Overall, it is evident that the vast majority of the industrial area is currently underdeveloped. However, in the future, it will undergo significant construction, resulting in the development of infrastructure and facilities that did not exist before.

To be specific, there is a long river on the north side of the town that is flowing from east to west. Additionally, a roundabout is present in the middle of the map, connecting two roads with it, one on the right-hand side and another at the bottom. Factories are built alongside the roundabout and the roads. Lastly, farmland can be observed on the north side of the river.

Regarding the planned future map, all the factories will be replaced by housing in the future, whereas infrastructure like shops, playgrounds, schools, and medical centers, which are not present right now, will be introduced. A new roundabout will be built on the southern road, whereas a bridge will be established over the river to connect the area with the new housing that will be introduced on the northern side. The farmland will be relocated to the north-east side of the Norbiton area.

Word Count: 211

Answers On The Same Topic:

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps display an industrial area in the town of Norbiton, currently and a proposed plan for its transformation in the future. At this time, the Norbiton industrial area, located east of the town and south of the continuous river below farmland, consists mainly of numerous factories. In addition, one roundabout connects the eastern […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps display an industrial area in the town of Norbiton, currently and a proposed plan for its transformation in the future. At this time, the Norbiton industrial area, placed east of the town and south of the continuous river below farmland, consists mainly of numerous factories. In addition, one roundabout connects the eastern […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps illustrate the current layout of the Norbiton industrial area and the proposed development plan for its future transformation. At present, the Norbiton industrial area, situated to the east of the town and bordered by a river to the north, predominantly comprises factories. The area is connected to the town by a main […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps illustrate the current layout of the Norbiton industrial area and the proposed development plan for its future transformation. At present, the Norbiton industrial area, situated to the east of the town and bordered by a river to the north, predominantly comprises factories. The area is connected to the town by a main […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The diagrams illustrate the current layout and the proposed future development of the Norbiton industrial area. Overall, the planned development includes significant changes aimed at enhancing the infrastructure and accessibility of the area. These modifications include the addition of a playground, a bridge, more roads, and a residential area, transforming Norbiton from an industrial zone […]

See All

Other Topics:

The maps depicted the local park, which opened in 1920, and the same park today.

The maps illustrate the changes that have taken place in Grange Park between 1920 and the present day. Overall, the park has undergone substantial modernisation, with several of its original features being removed or replaced by more recreational facilities, most notably a children’s play area, a cafe and a large concert amphitheatre. In addition, the […]

The plan show a school in 1985 and the school now The maps illustrate the layout of a particular school in 1985 and how it looks currently.

There are two images of school building plans compared with each other. The first picture illustrates the school in 1985, and the second one shows the layout of a particular school now, with notable changes. In 1985, the school had massive useless places which decreased citizenship, for instance, a wide road, car parking, and playing […]

The plan show a school in 1985 and the school now The maps illustrate the layout of a particular school in 1985 and how it looks currently.

There is two images of school buildings plan compared with each other.In the first picture illustrated school in 1985 year,and in second one the layout of a particular school now with the noteable changing.In 1985 year the school had a massive useless places which deacrease citizenship, for instant widerly road,car parking and playing fields.And now […]

The diagrams below show the changes that occurred around a school between 1990 and 2010. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The illustrations display how changes are committed in school over the period of 1990 and 2000. Overall, despite some changes that includes , replacement of farmland with sports field and houses with car park and shops, institute have same buildings and road over the period time given. In 1990, there was a school building across […]

The maps below shows a plan of a city in 1950 and at the present. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps illustrate the development plan of a city in 1950 and at the present day. Overall, it is obvious that the city has undergone spectacular transformation after the development plan, most significantly, there has been surge in the population after the expansion of residential area and transportation facilities all around the city along with […]

The maps below show recent archaeological findings at a historic site in 2004 and 2014. Provide an overview of the information by identifying and describing the key details, and include comparisons where appropriate.

The maps illustrate how recent archaeological discoveries at a historic site changed between 2004 and 2014 . Overall , what is most striking when looking at the maps is that the area underwent a substantial transformation, primarily characterized by the excavation and uncovering of several ancient structures and public facilities. Meanwhile, the original woodland was […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.