🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 5+: The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Image for topic: The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image is a comparison of the current and planned future development of the Norbiton industrial area. The top map shows the current layout with a river to the north, farmland to the east, and a town to the south with dashed lines marking their boundaries. A factory is located to the southwest with a shaded rectangle representing a housing area and various straight and curved lines indicating roads. The compass rose points north. The bottom map depicts the planned future development with the same river, farmland, and town placement. However, it includes a playground to the east, a circular road with branches leading to various buildings, including what appears to be a housing area represented by shaded rectangles. The roads are more interconnected and there are additional smaller roads or paths.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The two maps illustrate an industrial area in Norbiton town and the development of the site planned for the future.

The industrial area is on the east of the town and on the south coast of the river. On the other side of the river, there is a farmland. In first map, there are just three roads and one circle. The three factories are located near the circle. The four factories are located on each side of the road and the remaining one is on the end of the road.

In second map, most of the factories will be replaced by housing buildings. The factory which is located on the lower left corner of the big circle will be replaced by shops. Some new buildings such as playground, medical centre and school will be added. Roads will be also developed. A road is constructed across the river to connect the industrial area and the farmland. There will be a new road on the north west of the big circle.

In conclusion, the industrial area of the Norbiton town will be quite developed in the future. The education, health quality, shopping and transportation of the area will be more improved.

Word Count: 199

Answers On The Same Topic:

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps display an industrial area in the town of Norbiton, currently and a proposed plan for its transformation in the future. At this time, the Norbiton industrial area, located east of the town and south of the continuous river below farmland, consists mainly of numerous factories. In addition, one roundabout connects the eastern […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps display an industrial area in the town of Norbiton, currently and a proposed plan for its transformation in the future. At this time, the Norbiton industrial area, placed east of the town and south of the continuous river below farmland, consists mainly of numerous factories. In addition, one roundabout connects the eastern […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps illustrate the current layout of the Norbiton industrial area and the proposed development plan for its future transformation. At present, the Norbiton industrial area, situated to the east of the town and bordered by a river to the north, predominantly comprises factories. The area is connected to the town by a main […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps illustrate the current layout of the Norbiton industrial area and the proposed development plan for its future transformation. At present, the Norbiton industrial area, situated to the east of the town and bordered by a river to the north, predominantly comprises factories. The area is connected to the town by a main […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The diagrams illustrate the current layout and the proposed future development of the Norbiton industrial area. Overall, the planned development includes significant changes aimed at enhancing the infrastructure and accessibility of the area. These modifications include the addition of a playground, a bridge, more roads, and a residential area, transforming Norbiton from an industrial zone […]

See All

Other Topics:

The maps below show the town of Langley in 1910 and 1950. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The maps illustrate the differences between the town of Langley in 1910 and 1950. Overall, the town of Langley in 1910 had mainly been an industrial and residential area, whereas 40 years after that, the area was changed into a more modern one. In 1910, there were townhouses on either side of Jordan Street, which […]

The two maps bello show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever revelant.

The two maps illustrate the changes made to City Hospital between 2007 and 2010. Overall, the hospital site was significantly redeveloped during this period, with major improvements to transport access and parking facilities. The most notable changes include the construction of a roundabout, a bus station, and the relocation and expansion of car parking areas. […]

The diagrams show how a district park looked ten years ago and how it looks now .

The rendered maps illustrate the layout a district park in 2004 and at present. Looking from an overall perspective, the district park had underwent various noticeable changes, with the built of new facilities and the redevelopment of existing sections to added a more services in a district park. To start with, in 2004, the left […]

The map shows the outskirts of the town of Fosbury in 1980 and 2015. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The illustration represents the outskirts of a town called Fosbury which underwent numbers of changes from 1980 to 2015. Some of the places are removed while some others have been replaced or updated. First recognizable thing that has changed is the addition of roundabout in the center of the town. Older junctions have been replaced […]

The charts show how an office looks like at present and its future development plan.

The maps represent the major changes that are expected to take place in an office between the present and future. Overall, it is evident that the area will undergo a substantial development, especially due to the change of infrastructure. To begin with, two of the four offices which are located along the same wall as […]

Q1) The diagrams below show the changes that have taken place at Queen Mary Hospital since its construction in 1960. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The diagram describes the changes that had occured at hospital which is located along the main road starting from year 1960 till year 2000. In these years several changes can be observed, and area near the hospital was subjected to changes by their designation. First, at the beginning year of 1960 when Queen Mary Hospital […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.