🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 4+: The maps below show an industrial area in the town of norbiton, and olanded devolvement of the site.

Image for topic: The maps below show an industrial area in the town of norbiton, and olanded devolvement of the site.
Our system will evaluate the answer based on this AI-generated description.
The image comprises two diagrams; the upper diagram titled "Neothorn industrial area now" depicts a town to the west, a police station in the southwest, a roundabout with three connections encircled by industrial buildings arranged in block patterns, and a factory to the east. The lower diagram titled "Planned future development" illustrates similar features with the addition of a path to farmland, a playground located northeast, a roundabout connected by four roads, and housing to the south near the town.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The plans display an industrial region which is planned for the future renovation of site.

Overall, Five new facilities will be included in further time. They are housing, shops, school , playground and medical centre. However some facilities remain the same.

At present, in industrial area, the town stand at westran side, while river in north side and farmland is across the river. Central part of this area have a roundabout and two road added with this, one is from main road and other from east side.

In future, All factories will have been removed and seven housing will be included , one of them will stand at beyond the river while framland change It’s location nearly. One factory will replace by a school whice will located end of the east road. One sort road add two roundabout, a shops will built left side and a medical will built in right side of this road . One extra road go to north -west corner with three housing around. Playground will replace by a factory which will located south side of the river

Word Count: 182

Answers On The Same Topic:

The maps below show an industrial area in the town of norbiton, and olanded devolvement of the site.

The two map illustrates an industrial area in the city of Norbiton and planned for well vision development of site. Overall, the norbiton indusrtial area is located east side of the town with a river on the north, seperating farmland and industrial area which is located in the center town. There are few factory and […]

The maps below show an industrial area in the town of norbiton, and olanded devolvement of the site.

The plans illustrate how an industrial area will be changed of the site in the town un the Norbiton. As can be clearly seen from maps, over the years, Norbiton industrial area will be modernized and will be reconstructed. Overall, the river flows in the north of Norbiton and a new long bridge will be […]

See All

Other Topics:

The maps illustrate how Riverside City Park changed between 1990 and 2025.

The map show that how riverside city park changed between 35 years like 1990 to 2025. Overall,in maps there are various change within 35 years but some spot never be changed still located at same place like central fountain,car park also bridge and river at the same place.Beside the roads map little bit same also […]

The plans below show a village in the UK in 2000 and now. Summarise the information by selecting and reporting the main features and make comparison where relevant.

The map below illustrate two pictures of the same village in the UK, one of them is in the year 2000, while the other one is in the present time. Overall, the biggest diffrence is the amount of new constructions taking places, mainly houses and empty buildings. Map A,starting south going up north following the […]

The two maps show the layout of a university sports center in 2007 and its current layout.

The maps illustrate the changes of a university sports center in 2007 until now. Overall, there had been significant changes in infrastructure and facilities over the period, with the most noticeable changes being the relocation of the football pitch and the addition of running track. Meanwhile, the elimination of temporary teaching huts was removed, including […]

The layouts below show a city park before modifications and the same current park.

The given maps illustrate city park before and after transformation and let us investigate the differences between two versions. Overall, compared to the previous version, the modern park has much more infrastructure not only for leisure activity, that is nowadays presented on the left part of the park, but also for sport activity on the […]

Summarize the changes in the Layout of the Woodwards University in 1985 and now

The two maps illustrate information regarding modern and new facilities in Woodward university building area from 1985 to now. Overall, some buildings were expended and new and modern buildings were built, which resulted in the disappearance of many buildings. In addition, the green space appeared and it became eco-friendly. In 1985, there was an admin […]

The two maps show Kingston's University Hospital in 1990 and 2020.

The map illustrates huge developments that taken place in Kingston’s University Hospital over the period 1990-2020. Overall, a substantial change occured in the hospital’s area, particularly on the eastern side of the map compared to western side. In 2020, It can be seen that the north-east of the blueprint, the university hospital expanded into two […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.