The maps highlight the transformations in space after construction of a hydroelectric power embankment.
Overall, it is clear that the area was converted to an industrial place from a farm. Of a paticular note is that endangered animals and unusual plants were cleared, instead of them, built new electricity which was generated by the river. Interestingly, the river which divided the area into two venues was blocked from above the venue to create a lake for boats and fish.
To delve into the specifics, the forest, rare animals and plants and traditional architecture to the north-west of the place were cleared, to construct new electricity which was generated by river between 1990 and 2010.
As for northeast of the area, the lake which was served by boats and fish was emerged by putting hydroelectric dam above the river. Interestingly, a village to the right of the area was relocated below the area. Notably, extra hotel was constructed to the east of the place between 1990 and 2010.
