The given pictures depicts the thethe waterfront section of a city after some developments in 2002 and 2022.
Overall, it is clear from the pictures that massive changes have been made to the part of the city with different infrastructures being added over the period of time.
In 2002, the western part of the waterfront section at the harbor, there was a container ship piers with warehouses beside them. The factories were scattered around the shore of harbor. Also, at the northern end of the front there was a ferry terminal.
By 2022, the container ships piers were transformed to marina and several parks were introduced at the western and eastern part of the front. The warehouses and factories were also replaced by a hotel. To the other side of the harbor the factories were replaced by a office tower. At at the river banks on both sides several new houses were also developed.
