The construction schemes portray university sports courts from 1990 and the present.
Overall, the area of the sports zone widened without major adjustments in length. Most places changed their position. Some of them were reconstructed into something else.
Firstly, the left side of the map completely shifted from park and carpark to basketball and four tennis courts. Tennis courts were also doubled since 1990. The cafe remained in its original place but expanded in length. The reception and changing room experienced minor changes in their placement. The reception was rotated ninety degrees from its original location. The changing room was initially under the reception; however, it was relocated under the pool.
The outdoor pool shrank in width and was roofed, so it became indoor. The fitness center is a completely new zone that is now positioned in a free space under the changing room. Meanwhile, the park and carpark were completely removed from the map in the newer version. Although the number of objects remained constant, visually there is more unoccupied area in the current plan.
