The maps showcase the differences of a seaside village between the year 2015 and now.
Overall, the seaside village underwent many changes. While the housing area, cafe, and hotel remained the same, almost everything else has been turned into something else. The fishing port was also removed.
In 2015, the farmland and the forest park was located on the northest of the village. These areas had been turned into a golf field and a tennis court. The fishing port was removed entirely and the fish market on the shore of the sea had been demolished. The apartments were then built there. The shops, which located across the fish market in 2015, were changed into restaurants.
An addition of houses is seen to have been added to the housing area on the northwest. Moreover, the road, which used to be a dead-end for the residents to use, has been extended with two more houses added on the south of the rode. The hotel on the opposite of the cafe, which remained the same, has added a car park right next to it.
