The map illustrates how the Huntingdon has changed throughout the time and how it will changed in future.
Overall, the area experienced significant changes, the most notable development is the road and the bridge which will be removed in the future. Where as, roundabout will be constructed near a bridge .
At present time,there is a arifield at the northern part of huntingdon .where as there is railways stations under the bramptorn road . The road have three bridges which connects the town center and ring road . There is a bult uo area which contain homes, shops and etc near the railway tracks.
In future, the maps showed that airfield will be replaced by industrial estate and it will be connected with the railways tracked . The bramptorn road and the railways station remain same as present but the track of railways will be expanded in wide and roundabout will be constructed by removing the one bridge while other two bridge will be remain same as in present. Additionally the built up area and town center will not be changed.The ring road will have access with A14 highway .
