The two maps illustrate the current layout of an industrial area and the proposed redevelopment into a residential zone.
In general, the industrial area saw striking transformations, with the most salient removal of industrial facilities and addition of housing estates.
At present, the current entrance and reception block are located on the northern side of the site. These will be demolised to make room for a much larger building, containing three 2-bedroom homes and a large dedicated area for communal gardens. To the eastern part of the site, another remarkable development is reflected in the replacement of a current factory by the construction of a new apartment and parking area.
On the western side of the site, the existing packing and storage buildings will be removed to construct a 3-bedroom and a 4-bedroom house. Furthermore, the southern side of the site is currently occupied by a large office block and canteen, which will be transformed into parking garages