The maps illustrate the plan of the university sports center in 2007 and the present day. Overall, it is clear that the university sports center has undergone significant development since 2007, with the addition of several new facilities. The main changes include the replacement of grass football pitches with all-weather ones, covered by a running track, as well as the expansion of teaching facilities. In addition, the temporary teaching hut was replaced by four new sections – first aid, clinic, lab, and 2-story teaching facilities.
In 2007, there was a football pitch with grass located on the top of the plan. In contrast, in the middle stood 3 sections – a swimming pool, a tennis court, and a teaching facility area with 20 seats – and nearby to the middle was a temporary teaching hut with 3 separate rooms.
At present, the sport center is modernized with new features. The grass of the football pitch was changed to an all-weather one, and it is surrounded by a running track. The tennis court was replaced with a squash court, followed by the teaching facilities being expanded to 47 seats. At the same time, the temporary teaching hut was removed, and 4 new sections were built in its place.
